"without a role of action, the aim cannot be achieved"-Kovendhan's
River Ganga is considered as our National River, but it was polluted more than
other rivers. So, there was a need of cleaning the River Ganga. As a citizen of
India, it is all of our duty to keep our National River in a good condition.
This article contains history about the River Ganga and the causes which are
lead to the impurity of the Ganga, the need for cleaning the Ganga, the
Administrative steps which are taken by the Government to clean-up the Ganga and
also deals with the Ministry of Water Resources Development and Ganga
Rejuvenation in a broader manner and also contains suggestions for the
improvement of these plans.
Indian civilization grew up under the care of river Ganga for
thousands of years, grown up for generations by her generous boundaries. River
Ganga along with her many sub rivers provided material, spiritual, and cultural
sustenance to millions of people who lived in and around her basin. To the
Indian mind, River Ganga is not only the holiest of rivers and purifier of moral
beings but also a living goddess! So she was considered as “Mother Gangaâ€.
Even today river Ganga was considered as the physical and spiritual
lifeline of India. Therefore, Ganga was officially declared as India’s National
River by the government on November 4, 2008. But national concern about
environmental problems of Ganga River and her basin had also become serious by
then. In this article, we discuss the problems relating to Ganga and the
authorities established for its rehabilitation.
Brief History of River Ganga:
The River Ganga, the most sacred and important rivers of India, is considered as
the cradle of Indian civilization. The 2,525 km long river starts from Gangotri
in the Himalayas and joins the Bay of Bengal, at Ganga Sagar. The average depth
of the river is 52 feet & the Maximum is 100 feet. Gangotri is situated at the
bank of river Bhagirathi in Uttarkashi District of Uttarakhand located at a
height of 3042 metres from the sea level.It has a catchment area of 8,61,404
square km covering over a quarter of country’s land area and sustaining 46% of
the total population of the country. It touches 118 towns and 1657 Gram
Panchayats across 66 districts of 5 states of India.
At the previous stage River Ganga was known as the symbol of purity, so taking a
bath here is known as a sacred activity. But now Ganga was polluted mostly by
the industries, human activities and natural causes.
Causes For The Impurity:
There may be many causes for the impurity of River Ganga. Which was generally
categorised into two types,
i) Natural causes,
ii) Man-made causes.
Natural Causes
Soil erosion due to rains, deposition of dead and decaying remains of plants and
animals, high-speed winds, floods, etc., are some of the natural phenomena that
contribute to water pollution.
Man-Made Causes
Due to the mixing of Sewage disposal and Industrial waste in the River Ganga
causes pollution to it. Our national river is one of the most polluted rivers in
the country, and one of the 10 most threatened river basins in the world. The
quality of the Ganges is decreasing steadily. Due to the mixing of wastages, the
water of Ganga is not only unfit for drinking but also harmful to agricultural
purposes. The level of Coliform bacteria, a type of bacteria which indicates the
purity of water, must be below 50 for drinking and above 5000 for agricultural
purposes. The present stage of Coliform in the Ganga is 5500.Disposal of dead
bodies and immersion of idols of gods and goddesses into water bodies during
various festivals in India degrade the quality of water. Such water pollution
can affect the ecosystem of the river.
Need To Clean Up The Ganga
The River Ganga was most polluted in the recent years. Recently, discharges from
the Barauni Oil Refinery caused gross pollution along a long stretch of the main
Ganga. The main factories, which pollute the stream are sugar, distillery, tin,
glycerine, paint soap, rayon, silk and yarn.
A major step to control and clean up the Ganga had been taken in1984 when the
Central Ganga authority was established to implement the Ganga Action Plan. This
plan had identified 27 cities and 120 factories as points of pollution from
Haridwar to Hooghly.
According to a recent survey made by The Department of Atomic Energy’s National
Centre for Compositional Characterisation of Materials (NCCM) in Hyderabad has
tested water samples from Ganga and found the river water contained Carcinogens.
So, a dip in river Ganga can possibly cause cancer.
A study conducted by the Uttaranchal Environment Protection and Pollution
Control Board (UEPPCB) categorised river water into four categories, A being fit
for drinking, B for bathing, C for agriculture and D is for excessive pollution
level. The sad news is that the Ganga’s water is given a definite D.
There are 400 million people who live close to the river Ganga, so there was a
need to clean the River Ganga. Because their basic needs should be fulfilled
only by the river.
Government Effort To Clean Up Ganga
The government had taken many steps to clean the River Ganga. It comes under The
Union ministry of water resource and river development. The Environment
(protection) Act, 1986 made empower the Central Government to take all necessary
measures to protect and improve the environment.
The Ministry Of Water Resources, Development And Ganga Rejuvenation
The Ministry of Water Resources, River Development and Ganga Rejuvenation is the
apex body for formulation and administration of rules and regulations dealing
with development and regulations of the water resources in India. The Ministry
was formed in January 1985 following the separation of the separation of the
then Ministry of Irrigation and Power, when the department of Irrigation was
reconstituted as the Ministry of Water Resources. In July 2014, the Ministry was
renamed to “Ministry of Water Resources, River Development & Ganga
Rejuvenationâ€, making it the National Ganga River Basin Authority for
conservation, development, management in the river Ganges and its tributaries.
Ø Ganga Action Plan
The Ganga Action Plan or GAP was a program launched by Government of India in
April 1985 in order to reduce the pollution in the river Ganga. The program was
launched with more importance but it failed to reduce the pollution level in
Ganga. This plan spent 901.71 Crore rupees over a period of 15 years.
The Cabinet approved the GAP (Ganga Action Plan) in April 1985 as a 100 percent
centrally sponsored scheme. This Action Plan has two Phases.
Ganga Action Plan Phase I & II
The Ganga Action Plan (GAP) Phase-I was launched in 1985 and later GAP Phase-II
was initiated in 1993 with the objective of improving the water quality of river
Ganga and was later expanded to include some of its tributaries also. To oversee
the implementation of the Ganga Action Plan and to lay down the policies and
programmes, Government of India constituted a Central Ganga Authority (CGA) in
February 1985, later it was renamed as the National River Conservation Authority
(NRCA) in September 1995, under the chairmanship of the Prime Minister. The
Government also established the Ganga Project Directorate (GDP) in June 1985 as
a wing of Department of Environment, to execute the projects under the guidance
and supervision of the CGA.
According to many Environmental thinkers, this GAP was an over-ambitious
project. The money which is allocated to spend for this program was not used
properly, due to Corruption.
Ø National Ganga River Basin Authority (NGRBA)
The Government of India has given Ganga the status of a National River and has
constituted the National Ganga River Basin Authority (NRGBA) on 20thFebruary
2009 under Section 3(3) of Environment (protection) Act, 1986.
The NGRBA is a planning, financing, monitoring and coordinating body of the
centre and the states.
The objectives of NGRBA are:
(a) to ensure effective abatement of pollution and conservation of the river
Ganga by adopting a river basin approach to promote inter-sectoral co-ordination
for comprehensive planning and management, and
(b) Maintaining environmental flows in the river Ganga with the aim of
ensuring water quality and environmentally sustainable development.
The Ministry of Water Resources, River Development and Ganga Rejuvenation (MoWR,
RG & GR) is the ministry for the NGRBA. Prime Minister is considered as the
Chairperson of the authority and Union Ministers and Chief Ministers of the
states as its members.
The NGRBA is fully operational and also supported by the state level state Ganga
River Conservative Authorities (SGRCAs) in five Ganga basin States which are
chaired by the Chief Ministers of the respective states. National Ganga River
Basin Authority (NGRBA) has started the Mission Clean Ganga with a changed and
comprehensive approach to succeeding the challenges posed to Ganga through four
different sectors, namely, of wastewater management, solid waste management,
industrial pollution and riverfront development.
Ø National Mission For Clean Ganga (NMCG)
It was the enforcing wing of the National Ganga River Basin Authority (NGRBA).
The NMCG was created in June 2014, is the planning, financing, monitoring and
coordinating body at the Union Government and is supported by suitable State
level Program Management Groups (SPMGs) for the purpose of achieving the two
objectives of the NGRBA;
·Effective abatement of pollution and
·Conservation of the river Ganga by adopting a Comprehensive river
basin approach.
The NMCG is established by the Ministry of Water Resources, River Development
and Ganga Rejuvenation society under the Societies Registration Act 1860 for the
implementation of the World Bank assisted National Ganga River Basin Project
(NGRBP) of the National Ganga River Basin Authority (NGRBA).
The Order issued through the Gazette of India on 7thOctober 2016
constituting River Ganga (Rejuvenation, Protection and management) Authorities
under the Environment (Protection) Act, 1986 lays down a new institutional
structure for policy and implementation in fast-track manner and empowers NMCG
to discharge its functions in independent and accountable manner. The said
Authority has jurisdiction over the 5 States along the mainstream of Ganga and
Union territory of Delhi along with the major tributaries of the river Ganga.
Under Rural Sanitation Program, NMCG has provided Rs 263 Crore to Ministry of
Drinking Water & Sanitation for construction of toilets.
Ø Namami Gange Project
In May 2015, the Government approved the Namami Gange Programme as a
comprehensive mechanism to take up initiatives for Rejuvenation of river Ganga
and its tributaries as a Central Sector Scheme with hundred percent funding by
the Union Government. It is an integrated Project that will also help the
population of India who is dependent on the river. Initially, the Project was
allocated a budget of Rs.2037Crores.Under this Project, the government ordered
48 out of industries to shut down. The scheme will cover 47 towns in 8 states.
This is not the first project to clean Ganga, previous governments have also
introduced many projects to clean the river. But most of them did not perform as
expected. So, the Namami Gange Project has strict rules. The programme, despite
making moderate gains in arresting the declines in Water quality, had certain
limitations in implementation. The Project is set to get completed by the year
2020. As a part of a Namami Gange Project, the banks of the river will become
free of open defecation. So, the Namami Gange Project and the Swatch Bharat
Abhiyan will go hand in hand in this case.
Ø Swachh Ganga Abhiyan
Ganga is not only a river of religious importance but many people depend on it
for their livelihood. We want the campaign to be associated with employment and
livelihood.
Union Water Resources Minister Uma Bharti said Uttarakhand is not the only
source of the river Ganga but it has huge potential for medicine-based services.
The state can earn worldwide fame by growing and processing medicinal plants.
Speaking about her stance on the construction of dams, the Union
Minister said she was not against it unless dam projects hinder the environment
flow of rivers.
Ø National Green Tribunal
National Green Tribunal plays an important role in giving directions and dealing
with the cases in cleaning the Ganga. Ever since the Supreme Court had
transferred 30-year-old cases, which dealt with the tardiness in cleaning the
Ganga, to the routinely pulled up officials in the Central Pollution Control
Board and the Union Ministry of Water Resources and Ganga Rejuvenation, and the
Uttar Pradesh State Water Board for poorly executing projects.
The NGT has fined Officials for inaccurate information on the 30 drains in the
State and “wasting public money†on commissioning projects that didn’t properly
account for the pollution load in the city. Out of a ₹20,000-crore clean-up
programme, only ₹2,000 crore has been sanctioned to the National Mission for
Clean Ganga.
Judgement Of The National Green Tribunal Regarding Ganga Water Pollution
In
M.C. Mehta Vs Union of India & Others, National Green Tribunal notes that GAP
I & II has failed to yield the required results and on contrary there has been a
tremendous increase in the Industrial and Sewage pollution load in river Ganga
and its tributaries.
Some of the directions passed by the NGT are:
1) All the 86 drains, as well as other major drains, should be waste
removed.
2) There shall be a complete prohibition on disposing of MSW, E-waste or
bio-medical waste into the river Ganga or its tributaries.
3) Any Government Agency, Public Authority, Industry or person who violates
the directions shall be liable to pay environmental Compensation of Rs.50, 000
for each breach or default.
Ø River Ganga (Rejuvenation, Protection And Management) Authorities Order,
2016
The Centre has approved the River Ganga (Rejuvenation, Protection and
Management) Authorities Order, 2016, which gives the National Mission for Clean
Ganga (NMCG) more powers in taking action against polluting industries. The
power so far lays with the Central Pollution Board.
Water Resources Minister Uma Bharti said, “It will also ensure proper
coordination with the local bodies and compliance with directions of the NMCG
for pollution abatement of the Gangaâ€.
The Order also delegates financial and administrative powers to NMCG to
accelerate the process of project implementation for Ganga rejuvenation.
It has been decided to grant a mission status to the Authority with
corresponding powers under Environment (Protection) Act, 1986.
The NMCG will have a two-tier management structure with a Governing Council (GC)
and an Executive Committee (EC). The order delegates financial and
administrative powers to NMCG to accelerate the process of project
implementation for Ganga rejuvenation.
Finally, this order has given more powers to the National Mission for Clean
Ganga (NMCG) in taking action against polluting industries.
With No Action Plan, Mission Spends Fewer Funds
The NDA government’s record in implementing Prime Minister Narendra Modi’s pet
Clean Ganga project has been very poor, and the national mission has been able
to spend less than a quarter of the funds earmarked for the project in the last
two financial years, said a report tabled by the CAG.
According to CAG report, “Out of ₹6,705 crore earmarked during 2015-16 and
2016-17, NMCG [National Mission for Clean Ganga] could spend only ₹1,665.41
crore, less than a quarter of the expected year-wise release of funds,â€. So,
there was a low utilisation of funds indicate poor implementation of the
programme.
Not having an action plan also led to non-utilization of any amount from the
corpus of ₹198.14 crore available in the Clean Ganga Fund created through
voluntary donations by citizens and non-resident Indians.
So, there was a deficiency in planning and laxity in spending available funds by
the State governments as targets set for constriction household toilets and
making villages open defecation free were not achieved.
Out of 46 sewage treatment plants, there were delays in 26 projects due to delay
in execution of projects, non-availability of land and slow progress of work by
contractors.
Suggestions
There are few suggestions given to make Ganga pollution free. They are:
·If there was any need for the dam, it must be constructed in a way
that it shouldn’t decrease the flow of the river.
·Electronic crematoriums must be set up near the river banks for free
or low charges.
·Spiritual leaders should encourage devotees to offers prayers in an
eco-friendly way.
·Heavy, fines must be levied on those who pollute the water.
·Students must be taught about the importance of Cleaning Ganga and the
reasons for pollution.
·Special task force should be appointed for maintenance of the river.
·Local people should be involved in cleaning mission.
·Trees along the Soil erosion and in cleaning the pollutants.
·The outdated sewage plants need to be modernized. Small sewage plants
should be set up in small towns and villages around Ganga River. Sewage plants
which are situated in the Agricultural land should be avoided.
Conclusion
Instead of a large amount of money was allocated to the Clean Ganga Project,
there was no proper implementation of the plans. There was lack of awareness
among the people. So, spreading awareness about the condition of the river is
the main solution to river Ganga. With effective plans and implementation, the
Ganga River can be cleaned. Not only river Ganga, most of the rivers which are
in our country are should be cleaned. A need of cleaning Ganga is considered as
important because it is our National River. So, I hereby conclude the article by
saying that, cleaning the River Ganga should not be considered as the work of
government, it only becomes possible when each one of the Citizen thinks that it
was their duty towards their country.
How To File For Mutual Divorce In Delhi Mutual Consent Divorce is the Simplest Way to Obtain a D...
It is hoped that the Prohibition of Child Marriage (Amendment) Bill, 2021, which intends to inc...
One may very easily get absorbed in the lives of others as one scrolls through a Facebook news ...
The Inherent power under Section 482 in The Code Of Criminal Procedure, 1973 (37th Chapter of t...
The Uniform Civil Code (UCC) is a concept that proposes the unification of personal laws across...
Artificial intelligence (AI) is revolutionizing various sectors of the economy, and the legal i...
Please Drop Your Comments